SH130 Toll Road




| Owner | Texas Department of Transportation (TxDOT) |
|---|---|
| Client | DMJM+Harris (now AECOM) |
| Project Location | Williamson & Travis Counties, Texas |
Key Features:
- Design-Build Delivery Method
- Multi-level Interchanges
- Aesthetic Design
Beginning at IH-35 in Georgetown, this toll road bypasses the Austin area to the East and ends at the intersection of Highway 183 in Mustang Ridge. P.E. Structural Consultants, Inc. assisted Lone Star Infrastructure in the Proposal Phase, providing preliminary design and developing the Aesthetic Design Guidelines for Structures in this landmark turnpike project encompassing approximately 50 miles of new toll road. As a subconsultant to DMJM+Harris, PESC continued to contribute as a major component of the Structures Design Team in the aesthetic design of bridges, retaining wall and sign structures, in the structural design of approximately half of the 118 bridges in Segments 1 through 4 of the project, and in the structural design of all the Mainlane and Ramp Toll Plaza facilities.
PESC Staff were the Engineer of Record or played a key role in the design of the following SH130 Major Bridges:
- IH-35 Mainlanes over Dry Berry Creek (Widening)
- SH195 EB Frontage Road over IH-35
- SH130 NB Frontage Road over IH-35
- SH130 SB Frontage Road over IH-35
- Direct Connector SH130 NB to IH-35 NB
- Direct Connector IH-35 SB to SH130 SB
- SH29 over SH130 Mainlanes
- SH130 Mainlanes over US79 & Union Pacific
- R.R.US79 WB over SH130 Frontage Road
- SH130 Mainlaines over Brushy Creek
- SH130 Mainlaines over FM685 North
- Gattis School Road over SH130 Mainlanes
- SH130 Mainlanes over Kelly Lane (SH45)
- Direct Connector from SB SH130 to WB SH45
- Direct Connector from EB SH45 to NB SH130
- Direct Connector from NB SH130 to WB SH45
- FM685 South Over SH130 ML
- SH130 Mainlanes over Pfluger Lane
- SH130 Mainlanes over Wilbarger Creek
- Pecan Street over SH130 ML
- SH130 Mainlanes over Howard Lane
- SH130 Mainlanes over Gilleland Creek
- SH130 Mainlanes over Parmer Lane
- Direct Connector from EB US290 to NB SH130
- SH130 Mainlanes over CMTA RR
- SH130 Mainlanes over Blue Bluff Road
- FM973 over SH130 Mainlanes
- SH130 Mainlanes over FM969
- SH130 Mainlanes over Elm Creek
- SH130 Mainlanes over Harold Green Road
- SH130 Mainlanes over Colorado River
P.E. Structural staff, working out of the Pflugerville project office, provided technical leadership in all aspects of bridge design, developing design protocols and tools for use by the entire team. Senior PESC engineering staff provided quality control and assurance for the design process. $1.5B Construction. Completed 2008.